Products
Ceramic Clay Fire Assay Crucible For Lab Gold Melting and Precious Metal Analysis
Metals recovered in fire assaying crucible are the metals that emerge from the fusion of the material in a assay furnace, for gold, usually at temperatures of about 2,000 Degrees F. The Fire Assay Method is centuries old, but it is still one of the most reliable methods for performing assays (to determine the metal content of a ore) of ores that contain precious (noble) metals - Gold, Silver and Platinum.
Category:
Fire assay crucible
Contact us
Product description
Fire Assay Crucibles have a higher than normal resistency to cracking under fire assay conditions. Our crucibles are used in laboratories throughout international marketplace. We have a variety of shapes and sizes available to cater to specifications required.
Our crucibles give longer life, faster melting, constant melting speed and exceptional resistance to violent changes of temperature.
Applications
Precious Metal Analysis
Mining Laboratory
Laboratory Testing
Mineral Assaying
Fire Assaying
Gold Assaying
…
Item: |
Fire assay crucible |
Process Type: |
Rolling molding |
Material: |
SiO2 + Al2O3 |
Tolerance: |
+-2mm |
Facility: |
Automatic molding equipment |
Certificates: |
ISO 9001 SGS |
Shipping: |
Many stocks , delivery time around 5-10days . by sea or by air as customer request |
Delivery & Service: |
Timely delivery each time. Provide reliable service and responsible for each customer with each product. Our target is to satisfy every customer with the best service. |
Chemical Composition
SiO2 |
54.6% |
Al2O3 |
40.31% |
Fe2O3 |
1.11% |
TiO2 |
0.47% |
CaO |
1.28% |
MgO |
0.34% |
K2O |
0.61% |
Na2O |
0.39% |
L.O.I(loss on ignition) |
0.21% |
Feature:
Long lasting, can be used many times
High mechanical strength designed to withstand severe thermal shocks
Special formula, curing and pressing process
Can withstand extremely corrosive fire assay environments
Can withstand repetitive thermal shocks from 1300 degree Celsius to room temperature
OUR ADVANTAGE:
7000 square meters work shop
Automatic production line
Longer working life
Reasonable price
All prototype products have to go through 4 checks in the whole process:
1. Raw material inspection
2. In processing inspection
3. Final inspection
4. Outgoing inspection
Related Products

Product consultation